With approximately 70 acres of development potential, the Oakland County Business Center (OCBC) has ample room for build-to-suit sites for businesses in need of research and development, corporate offices, warehouses, distribution centers, light manufacturing, or flex-type space. The majority of the site was recently rezoned to General Industrial while the remainder of the site lies within the Summit Place Overlay Zoning District, created to facilitate the redevelopment of the site by providing more flexible regulations (including permitted industrial uses) and simplifying the approval process. The site is strategically located in the center of Oakland County, with no mapped wetlands or floodplains on the site.

In 2023, the site underwent a comprehensive due diligence review through the VIP program, including a detailed site condition analysis, comprehensive information on utility providers and capacity, and a comprehensive report on site details (full report in the document library below).

Zoning and Land Use

Zoning:

  • M-2; General Industrial – 56.10 acres
  • C-4; Extensive Business – 14.55 acres
  • Industrial uses allowed per Summit Place Overlay Zoning District in the 14.55 acres

Current Land Use: Vacant, formerly the site of Summit Place Mall

Future Land Use: Business use

Site Conditions

Greenfield or Brownfield: Brownfield

Above ground structures: None – Demolition of the former shopping was completed in 2019

Floodplain: No 100-year floodplain or 500-year floodplain

Wetlands: No mapped wetlands on the site

Topographic Elevation: Most of the Site lies between 978′-982′

Soil Types:

  • Urban Land (59), 0 to 1 percent slopes
  • Glynwood Loam (20B), 2 to 6 percent slopes
  • Blount Loam (32B), 0 to 4 percent slopes
  • Glynwood Loam (20C), 6 to 12 percent slopes

Easements: Investigations regarding Title are necessary to better understand encroachments on the Site

T&E Species:

  • Snuffbox Mussel – Clams (Epioblasma triquetra)
  • Rayed Bean – Clams (Villosa fabalis)
  • Poweshiek Skipperling – Insects (Oarisma poweshiek)
  • Indiana Bat – Mammals (Myotis sodalis) 

Archaeological & Cultural Resources: No historic districts or properties are located within or adjacent to the project site. No archaeological sites are located within or adjacent to the project site.

Utilities

electric utilities icon

Electric

Provider: DTE Energy

Current Service: 1 MW service capacity; 13.2 kV aerial system along Elizabeth Lake Road; 13.2 kV aerial system east of Summit Drive; 13.2 kV and 40 kV aerial system along Mall Drive and Marion Avenue

Assumed Demand: 5 MW

Recommendations: None

 

gas utilities icon

Natural Gas

Provider: Consumers Energy

Current Service:  Consumers Energy facility maps show two existing services to the Site from a gas main along Elizabeth Lake Road

Assumed Demand: 13 MCFH baseline demand

Recommendations: Further investigation is needed to determine if utilities were abandoned during 2019 demolition work

 

water utility icon

Water

Provider: Waterford Township

Current Service: Waterford Township facility maps show an 8” and 6” water main running onto the Site from the main along Elizabeth Lake Road

Assumed Demand: 100,000 GPD baseline demand

Recommendations: Further investigation is needed to determine if utilities were abandoned during 2019 demolition work

 

sewer utility icon

Sewer

Provider: Waterford Township

Current Service: 10” sanitary sewer along Elizabeth Lake Road and 21” sanitary sewer along Summit Drive 

Assumed Demand: 75,000 GPD

Recommendations: Further investigation is needed to determine if utilities were abandoned during 2019 demolition work

Workforce Data

30-Minute Drive

1,612,905

Population

63,786

Total Businesses

797,830

Active Workforce

60-Minute Drive

4,953,211

Population

162,800

Total Businesses

2,196,163

Active Workforce

Transportation

Proximity to Highways

Site access on N. Telegraph Road (US-24), Elizabeth Lake Road, & Summit Drive

0.5 miles to M-59

4.7 miles to I-75

Proximity to Rail

1.5 miles to Class I CN Rail

2.3 miles to CN Yard in Pontiac, MI

Proximity to Airports

5 miles to Oakland County International Airport (Waterford, MI)

30 miles to Bishop International Airport (Flint, MI)

30 miles to Detroit Metro Airport (Romulus, MI)

Document Library

Desktop Due Diligence Report

Site Maps

Demographic & Business Data

Workforce Profile

Marketing Flyer

Regional Overview

Site Contacts

Site Representative

Arie Leibovitz

Chairman

Ari-El Enterprises, Inc.

Email: arie@ari-el.com

Phone: 248-763-1188 

Program Contact

Verified Industrial Properties program contact photo
Shannon Selby

Vice President of Real Estate