Ridge 5 Corporate Park

Techne Drive

Plymouth Charter Township, MI 48170

On-Site Investigation Report & Physical Site Studies updated 3/16/2026

CITY

Plymouth Twp.

 

COUNTY

Wayne

 

ACRES

125.16 Acres

43.55 Developable Acres

 

PRICE

Negotiable

 

ZONING

Industrial

 

DOWNLOAD

Marketing Flyer

 

Property Description

Ridge 5 Corporate Park in Plymouth Township, MI is a 125-acre site with 43.55 developable acres zoned for industrial use. The site is 2 miles to M-14, 6 miles to I-275, 22 miles to Detroit Metro Airport, and Class I CSX rail borders the site. Road, sewer, and water main utilities, and stormwater detention basin infrastructure are already constructed for the industrial development. Ridge 5 is an integral community within the Michigan International Technology Center (MITC) and will continue to develop as a hub for international business and technology.

In 2022 the site underwent the Site Assessment stage of the VIP program, including a detailed site condition analysis, comprehensive information on utility providers and capacity, and a comprehensive report on site details (full report in the document library below).

Zoning and Land Use

Zoning: IND (Industrial)

Current Land Use: Vacant

Future Land Use: No changes from an industrial site are anticipated

Site Conditions

Greenfield or Brownfield: Greenfield

Above ground structures: Johnson Drain, Detention Basins, and Territorial Court

Floodplain: 100-year floodplain and 500-year floodplain on-site

Wetlands: Johnson Drain

Topographic Elevation: Site generally slopes from East to West towards the Johnson Drain, ranging from 837′ to 847′

Soil Types: Sandy and silty loams in the flatter southeastern half of the site and clayey loams with isolated areas of peat much in the elevated area near the northwest corner

Easements:

  • Wayne County Drain Easement – Johnson Drain
  • Public Land – Linear Park along Johnson Drain

T&E Species: There are no endangered species, migratory birds, or protected plants and vegetation on the site

Archaeological & Cultural Resources: None

Utilities

Asset

Electric

Provider: DTE

Current Service: Power has not been distributed throughout the property, but will be served by overhead lines along Ridge Road and 5 Mile Road. The existing circuit can provide 5 MVA of load within 6(+) months.

Assumed Demand: 5 MW 3-phase electric for the park

Recommendations: Coordinate closely with DTE when project planning begins

Asset

Natural Gas

Provider: Consumers Energy

Current Service: Existing 4″ and 6″ medium-pressure main lines

Assumed Demand: 7,500 mcf/month

Recommendations: None, Consumers Energy has confirmed they will be able to provide the assumed demand

Asset

Water

Provider: Plymouth Township

Current Service: 12 inch water main line along east side of Ridge Road

Assumed Demand: 100,000 GPD

Recommendations: None, current capacity and distribution are expected to meet the demand of the site

Asset

Sewer

Provider: Plymouth Township / Great Lakes Water Authority

Current Service: 8″ PVC sanitary sewer along the north side of Territorial Court and 12″ sanitary sewer on the east side of Ridge Road

Assumed Demand: 75,000 GPD

Recommendations: None, current capacity and distribution are expected to meet the demand of the site

Workforce Data

30-Minute Drive

2,046,292

Population

74,151

Total Businesses

996,570

Workforce

60-Minute Drive

5,108,225

Population

173,012

Total Businesses

2,268,426

Workforce

Transportation

Proximity to Highways

Site Access on Ridge Road

2 miles to M-14

6 miles to I-275 access

Proximity to Rail

Class I CSX railroad borders the site

±11.5 miles to CSX Wayne Terminal in Wayne, MI

Proximity to Airports

12 miles to Willow Run (Ypsilanti, MI)

22 miles to Detroit Metro Airport (Romulus, MI)

Document Library

On-Site Investigation Report

Site Maps

Marketing Flyer

Demographic & Business Data

Workforce Profile

Regional Overview

Physical Site Studies

Unit 2 Topographic Survey – completed 8/28/2025

Unit 3 Topographic Survey – completed 8/28/2025

Unit 8 Topographic Survey – completed 8/28/2025

Geotechnical Report – completed 10/13/2025

Unit 2 Site Plan/Preliminary Engineering – completed 10/17/2025

Unit 3 Site Plan/Preliminary Engineering – completed 10/17/2025

Unit 8 Site Plan/Preliminary Engineering – completed 10/17/2025

Site Contacts

Site Representative 

Randall Book

Executive Vice President, Brokerage Services

Colliers

Phone: (248) 330-8281

Local Contact

David Schreiber

Senior Business Development Manager

Wayne County

Phone: 313-967-6421

Program Contact

Verified Industrial Properties program contact photo
Shannon Selby

Vice President of Real Estate